Electrical installations

230 V earthed socket (2 kW)[1]
24 hour current 230V – extra charge for the whole period[1D]
400 V socket 16 Amp. CEE connection[16]
24 hour current 400 V – 16 Amp. – extra charge for the whole period[16D]
400 V socket 32 Amp. CEE connection[32]
24 hour current 400 V – 32 Amp. – extra charge for the whole period[32D]
400 V socket 63 Amp. CEE connection[63]
24 hour current 400 V – 63 Amp. – extra charge for the whole period[63D]

Spotlights

75 W halospotX
160 W halogen spotlight on 50 cm arm for installation on fascia board or wallXA

Water and drainage

Sink unit including cold water and drainage - 60x75 cm- - •
Sink unit including cold water and drainage - 60x75 cm- - •
Sink unit including cold and hot water and drainage - 60x150 cm- -
Sink unit including cold and hot water and drainage - 60x150 cm- -
Cold water (½” pipe thread) and drainage (1” pipe thread)[VA]
Cold water (½” pipe thread) only[V]
Drainage (1” pipe thread) (pumped drainage)[A]

TILMELD NYHEDSBREV

Skriv dig op til at modtage vores nyhedsmail og få nyt om DanFish International direkte i din indbakke.

Tak for din tilmelding!

SUBSCRIBE TO NEWSLETTER

Sign up to receive our newsletter and get news about DanFish International directly in your inbox.

Thank you for signing up!